• Global ()

Americas

Select Country/Region :

  • Brazil ()
  • Canada ( / )
  • Mexico ( / )
  • South America ()
  • U.S.A. ()

Asia

Select Country/Region :

  • China ()
  • Hong Kong ( / )
  • India ()
  • Indonesia ( / )
  • Japan ()
  • Korea ( / )
  • Malaysia ()
  • Philippines ()
  • Singapore ()
  • Taiwan ( / )
  • Thailand ( / )
  • Vietnam ( / )

Europe

Select Country/Region :

  • Europe Gateway ()
  • Austria ()
  • Belgium ( / )
  • Czech ()
  • Denmark ()
  • Finland ()
  • France ()
  • Germany ()
  • Greece ()
  • Ireland ()
  • Italy ()
  • Lithuania ()
  • Netherlands ()
  • Norway ()
  • Poland ()
  • Portugal ()
  • Romania ()
  • Russia ()
  • Slovakia ()
  • Spain ()
  • Sweden ()
  • Switzerland ( / / )
  • Turkey ()
  • United Kingdom ()

Middle East and Africa

Select Country/Region :

  • Middle East and North Africa
    ( / )
  • Sub-Saharan Africa ()

Oceania

Select Country/Region :

  • Oceania ()
Close

关闭

关闭
日立电梯(中国) 事业发展历程 企业文化 人才发展计划 企业社会责任 新闻动态
首页> 关于我们> 新闻动态>日立新闻
日立新闻

电梯小百科③: 加装电梯流程大揭秘

2021-02-04 14:07 日立新闻

城市的发展让人们对居住环境的要求逐渐提高,再加上人口老龄化,很多老旧社区开始加装电梯。但苦于不了解电梯设备、资金筹备困难、邻里协商麻烦等问题,很多有心加装电梯的业主都还在犹豫中。加装电梯的流程有哪些?电梯公司在加装过程中如何协助业主?今天就来介绍一下加装电梯的具体流程。




前期


1、确认住宅是否符合加装电梯的基本条件。(具有合法权属证明或者合法报批手续,已建成投入使用的4层以上的多业主无电梯住宅;若加装电梯占用业主专有部分的,应当取得该专有部分的业主书面同意意见;若加装电梯涉及严重遮挡本幢及相邻房屋的,应取得该部分房屋的业主书面同意意见。)


2、成立加装电梯筹备委员会,通常是由积极的业主组成。


3、联系设计单位和电梯公司进行现场勘测,确定加装电梯的设计方案。


4、制定费用分摊方案、电梯维护保养方式以及维保费用分担方案、对相关利益受损业主的资金补偿方案。


5、征求全体业主的意见,取得“双三分之二”的同意(经本单元或者本栋房屋专有部分占建筑物总面积 2/3 以上的业主且占总人数 2/3 以上的业主同意)。


中期


1、国土资源和规划局或区政务服务中心提出申请,办理《建设工程规划许可证》。


2、街道办理开工备案。


3、将方案在加装电梯所在楼栋以及受严重遮挡的相邻楼栋内公示,在此期间,如有利害关系人可以提出反对意见。


4、签订三方合同。


5、土建施工、主体井道施工、外装饰施工等。


6、向政府部门报装,电梯安装调试,电梯检验验收。


后期


1、政府部门验收,办理《电梯使用登记证书》,交付使用。


2、正确使用电梯,签订维保合同对电梯进行长期维护保养。国家规定电梯必须每15天进行一次保养,在用电梯定期检验周期为1年。


3、向相关部门领取补贴。


热点推荐

最新资讯

相关阅读

联系我们

全国服务热线    400-8308-333

网站利用条件  |  个人信息保护政策

(c)Hitachi Elevator (China) Co.,Ltd. 2009-2018. All rights reserved.